References
Wind farm Baltic II (2004)
Conceptual foundation design
European Jacket Research Project (2005-2007) – 2 x 5 MW
Detailed engineering for deep water jacket foundations
Wind farm Rødsand II (2008) – 90 x 2.3 MW
Engineering for construction- and installation phase of gravity based foundations
Wind farm Baltic I (2008) – 24 x 3.6 MW
In-depth engineering assessment during tender phase
Wind farm London Array (2008-2010) – 175 x 3.6 MW
Tender and design management for fabrication and installation of monopile foundations
Wind farm Butendiek (2009) – 80 x 3.6 MW
In-depth engineering assessment during tender phase
Wind farm Nordsee One (2011-2012) – 54 x 6 MW
Transport and installation planning during development phase
Wind farm Gwynt y Môr (2010-2014) – 160 x 3.6 MW
Design and execution of transport and installation of monopile foundations; subcontractor management; technical coordination of jack-up vessel operation
Wind farm Nordsee Ost (2010-2015) – 48 x 6 MW
Design and execution of transport and installation of jacket foundations and wind turbines; subcontractor management; technical coordination of jack-up vessel operation